EPC
Nasr Petroleum company
Suez
June 2020
Establishing a line to receive the asphalt product from the tankers to expedite the implementation of the national development projects from the tankers at the Port of the Petroleum Basin to the Nasr Company.
Supplying and installing an electric heating system and supervising the thermal insulation of the asphalt line with a diameter of 12 ̏for a temperature of 170 ˚ and includes the following:
Manufacture and installation of metal structures 150 Tons.
Installation of Pipes (350 pieces).
Fabrication and installation of carbon steel pipes with a diameter of 3500 ̏by welding.