VCM Unit Pipe Rack Revamp


Category:

Engineering


Client:

Egyptian Petrochemicals Company


Location:

Alexandria, Egypt


Year Contract:

2021


Scope Of Work

Laser Scanning

Intelligent 3D Modelling

As Built Drawings

ONSPEC performed 3D Scan and Generated the Intelligent 3D Model of the VCM Pipe Rack that shall be demolished in the Revamp, in order to extract the As-built Piping Isometrics, and Drawings for Client Review and Approval for the Construction of the New Piperack. The Project Covered also updating the as-built P&IDs with client operations team to be a reference for the Intelligent 3D Modeling and As-built Piping Drawings.