Course Id: EEE103 | Duration: 3.00 day(s) | Level: Introductory
Course Objective
Learn how to develop in-plant design, estimate and schedule using Aspen In-Plant Cost Estimator. Reduce estimation variability by adopting a consistent methodology.
Course Overview
- Learn to create and build detailed project estimates using Aspen In-Plant Cost Estimator
- Learn how to use the Aspen In-Plant Cost Estimator system more effectively, tailoring it to specific project estimates
Benefits
- Learn how to use Aspen In-Plant Cost Estimator to evaluate your company's projects
- Maximize your company's return on investment (ROI) and reduce the risk involved in making decisions
- Compose specific outline scope definitions for Aspen In-Plant Cost Estimator projects
- Obtain in-plant designs and estimates from minimal input in a fraction of the time required by traditional methods
- Reduce estimation variability by adopting a consistent methodology
- Increase costing accuracy by generating detailed reports for analysis, traceable to line items, not lump sums of money
- Make adjustments to project estimates according to local area conditions
- Use system documentation to improve estimate consistency and reliability
Audience
Project Managers and Engineers, Plant Engineers, Plant Estimating Managers, Plant Estimators, Engineering Managers new to Aspen In-Plant Cost Estimator
Approach
- Instruction on basic topics
- Discussion about the general approach and the key elements for successful simulations
- Instructor-guided demonstrations of features
- Hands-on workshops that apply learned concepts
- Detailed course notes
Subsequent Courses
- EEE101: Introduction to Aspen Capital Cost Estimator
- EEE102: Introduction to Aspen Process Economic Analyzer