Course Id: EEE103 | Duration: 3.00 day(s) | Level: Introductory

Location
U.A.E. (Dubai)
Date
15-19 Aug 2018
Duration
3 Days
Price
2100 USD

Course Objective

Learn how to develop in-plant design, estimate and schedule using Aspen In-Plant Cost Estimator. Reduce estimation variability by adopting a consistent methodology.

Course Overview

  • Learn to create and build detailed project estimates using Aspen In-Plant Cost Estimator
  • Learn how to use the Aspen In-Plant Cost Estimator system more effectively, tailoring it to specific project estimates

Benefits

  • Learn how to use Aspen In-Plant Cost Estimator to evaluate your company's projects
  • Maximize your company's return on investment (ROI) and reduce the risk involved in making decisions
  • Compose specific outline scope definitions for Aspen In-Plant Cost Estimator projects
  • Obtain in-plant designs and estimates from minimal input in a fraction of the time required by traditional methods
  • Reduce estimation variability by adopting a consistent methodology
  • Increase costing accuracy by generating detailed reports for analysis, traceable to line items, not lump sums of money
  • Make adjustments to project estimates according to local area conditions
  • Use system documentation to improve estimate consistency and reliability

Audience

Project Managers and Engineers, Plant Engineers, Plant Estimating Managers, Plant Estimators, Engineering Managers new to Aspen In-Plant Cost Estimator

Approach

  • Instruction on basic topics
  • Discussion about the general approach and the key elements for successful simulations
  • Instructor-guided demonstrations of features
  • Hands-on workshops that apply learned concepts
  • Detailed course notes

Subsequent Courses

  • EEE101: Introduction to Aspen Capital Cost Estimator
  • EEE102: Introduction to Aspen Process Economic Analyzer